2 tunnels dug through in China-Laos Railway construction

Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
Video PlayerClose

LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

   Prev 1 2  

KEY WORDS:
YOU MAY LIKE
EXPLORE XINHUANET
010020070750000000000000011100001379790851
国产无码在线观看免费在线,37pao国产成视频,日韩一区二区视频在线,国产国产人免费人成免费视频麻豆
亚洲最大丝袜首页第一国产 | 午夜福利中文字幕首页 | 亚洲日韩在线中文字幕线路2区 | 日本乱理伦片在线观看中文字幕 | 亚洲日韩欧美香蕉一区 | 中文字幕在线中文一页 |