Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
Video PlayerClose

CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

Wan Fei, 40, the head of the inspection team from the Wuhan Power Supply Company under State Grid Corporation, walks through a muddy road in the mountain area of Wuhan, capital of central China's Hubei Province, Feb. 12, 2019. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

   Prev 1 2 3 4 5  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001378454891
国产无码在线观看免费在线,37pao国产成视频,日韩一区二区视频在线,国产国产人免费人成免费视频麻豆
中文字幕日本有码视频在线 | 日韩欧美a∨中文字幕 | 欧美国产日本高清不卡 | 亚卅日韩久久影视观看 | 在线看日本中文字幕不卡 | 亚洲人成色44444在线观看 |